With a production area now exceeding 5,000 square meters and an expanded cleanroom of 1,400 square meters (ISO Class 8), we are better equipped than ever to meet our customers’ needs. The new facility not only increases capacity but also incorporates modern and sustainable solutions, including energy-efficient heating and cooling powered by 13 geothermal wells, along with preparations for solar panels on the roof.
Its strategic location and efficient design allow us to optimize logistics, improve workflows, and deliver even more innovative and customized solutions. Additionally, the spacious site provides room for further expansion, ensuring that we can continue to grow alongside our customers and their needs.
The gradual move-in began in autumn 2024, and full operations are scheduled for January 2025. This investment strengthens our position as a reliable and innovative partner in injection molding, blow molding, and other medical technology solutions.
We look forward to continuing to create value for our customers and contributing to sustainable development in the medical technology sector.